Gas hot water in Berwick & the South East.
Rinnai Infinity, Bosch Highflow, Rheem Stellar. Continuous-flow instantaneous or storage, natural gas or LPG. Like-for-like replacements in 2-3 hours; storage-to-instantaneous changeovers in half a day. VBA-licensed gasfitter and plumber on every job.
Brand & model comparison.
Instantaneous (continuous flow).
- Rinnai Infinity 16 / 20 / 26 / 32: Australia’s most-installed unit. Bulletproof, parts everywhere, 12-year cylinder warranty. ~$2.2K-$3K installed depending on flow rate.
- Bosch Highflow 17e / 21e / 26e: German engineering, slightly quieter, excellent in hard-water suburbs. ~$2.3K-$3K installed.
- Rheem Metro / 5-star instantaneous: Australian-made, similar reliability to Rinnai. ~$2.1K-$2.9K.
Storage gas.
- Rheem Stellar 360 / 270 / 135: 5-star storage, sacrificial anode, internal or external mount. ~$1.9K-$2.4K installed.
- Rinnai HotFlo 170 / 250: Robust, simple, easy to service. ~$1.8K-$2.3K installed.
- Bosch internal storage: Where natural-vent flue is required indoors. ~$2K-$2.5K.
Sizing by household.
1-2 people: 135-170L storage or 16L/min instantaneous.
3 people: 170-250L storage or 20L/min instantaneous.
4 people: 250-315L storage or 20-26L/min instantaneous.
5+ people: 315-360L storage or 26-32L/min instantaneous.
What we do on site - honest.
Standard like-for-like gas storage replacement: we drain and remove the old unit, set the new tank, reconnect water, gas and electrical (240V for ignition), test for gas leaks (manometer + soapy water on every joint), pressure-test water connections, commission the unit, walk you through the controls. 2-3 hours.
Storage-to-instantaneous changeover: we relocate the unit (instantaneous mounts on an external wall for clearance), run a new gas line if the existing one is undersized for the new flow rate (a 26L/min Rinnai Infinity needs at least 20mm copper), penetrate the wall for the new flue, install the controller inside, then connect and commission. Half a day.
We pull a VBA gas compliance certificate on every gas install (legally required) and lodge it with the VBA - you keep a copy. No unlicensed handyman jobs.
Standards we work to.
- AS 5601 - Gas installations. The Australian Standard for gas pipework, sizing, flueing, ventilation.
- AS 3500.4 - Plumbing and drainage: heated water services. Tempering valve requirements, expansion control, pipework.
- AS/NZS 4234 - Heated water systems thermal performance. Used for energy rating.
- VBA registration - Gasfitter (Type A appliances) and plumber. Every job certified.
Gas hot water quote - usually within 24 hours.
Honest sizing, honest brands, honest pricing. We’ll tell you if heat-pump suits you better.